Thursday, May 16, 2019
Armco Inc. â⬠Midwestern Steel Division Essay
Armco Inc is a steel manufacturer that utilize to be the sixth largest in its industry in United States in 1990. The Kansas City Works indoors its Midwestern Steel Division was hit by the decline in the business in the US steel industry. The firm produces grinding media and carbon wire rod. The first one has been successful in the industry with its great durability compared to the competitors. Carbon wire rods on the other hand were non profitable and covered still some of its fixed costs through its cropion volume. The old performance measurement carcass apply by Armco Inc did not work properly beca handling it had some problems. First, it did not provide information on the product mix being produced while it provided data on total tonnage produced but didnt partition what was produced. Second the measurement musical arrangement compared actual to objective but didnt provide data on what factors exactly caused variance. Third, the costs were not broken down by fixed costs, variable costs and relevant range. Also the reports were generated on the 15th day following every month ending so I think managers could not take immediate corrective actions which would have been sometimes very necessary. In my opinion, likewise the fact that the system did not measure Key Performance Index for each department much(prenominal) as the new system, is one important reason why the old system was inadequate. Even if the operational managers liked the old system, the new system was necessary.The operating managers may have liked the old system probably because it is understandable that no one likes to be moved out of their familiar comfort regularize after m both years. In my opinion the greatest weakness of the old system is that the data it provides isnt clear enough and it is quite difficult to read and understand properly. The new system for instance proposes to counsel on ten different measures. The measures have exact goals which is positive. It is also good point that with the new system production managers were no longer held accountable for all costs incurred. It has to be said that the implementation of the emergence of the new system was done so fast that the top managers could not train other managers to use the new system. I think this was quite a problem. Some actions or changes could be recommended for the new system. For display case in my opinion it would probably be good to specify the fixed and variable costs so that managers could have an idea of the differences of each type of costs. Also the proper training supply for the managers would be much than important thing to do. Because there were some uncontrollable factors which affected significantly the production process I think Armco Inc could try to ask some energy companies to diagnose the transformer failures and figure out if there were any other ways to fix the problem permanently. They also could consider having some generators to back up the potential power fail ures so that the production would not stop suddenly.I read the documentary twice and do some notes about the key points. Then I tried to figure out the problems and the possible conclusions to them. I learned about the importance of proper measurement system and the importance of the functional training program for the managers if there are any changes in the important practices of the firm.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.